• Subscribe Today

Marine Construction® Magazine

  • Home
  • RESOURCES
    • EQUIPMENT
    • MATERIALS
    • SERVICES
    • LEGAL
    • EDUCATION
    • SAFETY
  • SUBSCRIPTION
    • PREVIOUS ISSUES
  • ADVERTISING
  • WEBINAR
  • VIDEOS
  • CONTACT
  • BLOG
  • Classifieds
  • Jobs
MCMag NEWS
  • Crowley named a Top Company for Women in Transportation   |   May 16 2025

  • John Deere Makes $100,000 Donation Match Commitment to Construction Angels Nonprofit Organization   |   May 14 2025

  • NTSB Accident Brief: The Capsizing and Sinking of the Crane Barge Ambition, Towed by Karen Koby   |   May 12 2025

  • Crane Fatigue – The Devil is in the Detailing Connection detailing is an underrated art form, especially on cranes.   |   May 09 2025

  • Selecting the Right PPE for Marine Construction   |   May 07 2025

  • ShibataFenderTeam supplies 11 Double Cone Fender Systems for Dundee Port expansion project, UK   |   May 05 2025

 
Home» BLOG»Crowley to launch LNG bunker at Panama Canal’s Pacific side
Above, location of future Crowley LNG service. Right, Miraflores Locks on the Panama Canal, Pacific Ocean and Panama City in the background.

Crowley to launch LNG bunker at Panama Canal’s Pacific side

Apr 25 2025 BLOG Comments Off on Crowley to launch LNG bunker at Panama Canal’s Pacific side 34 Views

Reading Time: 2 minutes

Global shipping and sustainable energy logistics leader Crowley is proceeding with plans to pro-vide liquefied natural gas (LNG) bunkering services on the Pacific side of the Panama Canal, under the first permit issued by the Panama Maritime Authority (AMP) for the provision of such services.

Crowley’s advanced energy group will operate the innovative service to manage the ship-to-ship LNG transfer services. With a potential start date in 2024, Crowley is preparing to provide bunkering and related port solutions to safely deliver lower emission LNG to vessels for fuel and cryogenic tank cool down services at the canal.

“LNG is widely accepted as the most practical transitional alternative fuel for maritime shipping and to stay ahead of the rapid deployment of LNG-powered ships across the global market, Crowley is strategically growing its LNG bunkering operations across North and Central America,” said James Fowler, senior vice president and general manager, Crowley Shipping. “The Panama Canal will become a key location for vessels to take on LNG, and Crowley’s future Panamanian bunkering service will give international ship owners confidence to continue to adopt LNG across their fleets.”

Miraflores Locks on the Panama Canal, Pacific Ocean and Panama City in the background

Crowley has served Central America including Panama for more than 60 years with maritime and logistics services. In 2014, Crowley received the first small-scale LNG export license from the U.S. Department of Energy for LNG transportation from the U.S. into Free Trade Agreement (FTA) and Non-Free Trade (NFTA) countries.

The company then pioneered small scale LNG transportation and engineering to Puerto Rico. Crowley’s services expanded in 2022 with the opening of an LNG truck-loading terminal in Peñuelas, Puerto Rico. A 12,000 m3 (3.17 million gallons) LNG bunker barge, the largest in the U.S., is under construction with a long-term charter agreement with Shell to begin service in 2024 for ships on the U.S. East Coast.

Crowley is a privately held, U.S.-owned and -operated maritime, energy and logistics solutions company serving commercial and government sectors with $3.4 billion in annual revenues, over 170 vessels mostly in the Jones Act fleet and approximately 7,000 employees around the world – employing more U.S. mariners than any other company. The Crowley enterprise has invested more than $3.2 billion in maritime transport, which is the backbone of global trade and the global economy.

Reprinted from Marine Construction Magazine Issue VI, 2023.

Crowley Panama Canal 2025-04-25
Tags Crowley Panama Canal
Facebook Twitter linkedin Pinterest Email Print More

Authors

Posted by : MCMag
Previous Article :

Perkins’ sales of 2.8 and 3.6 litre engines top 100,000 units

Next Article :

The Future of Electrification conference returns for its third year

Related Articles

Crowley named a Top Company for Women in Transportation

Crowley named a Top Company for Women in Transportation

MCMag May 16 2025
John Deere Makes $100,000 Donation Match Commitment to Construction Angels Nonprofit Organization

John Deere Makes $100,000 Donation Match Commitment to Construction Angels Nonprofit Organization

MCMag May 14 2025
NTSB Accident Brief: The Capsizing and Sinking of the Crane Barge Ambition, Towed by Karen Koby

NTSB Accident Brief: The Capsizing and Sinking of the Crane Barge Ambition, Towed by Karen Koby

MCMag May 12 2025

Advertisement

Current Issue

May 2025 Issue of Marine Construction Magazine

Previous Issue

April 2025 Issue of Marine Construction Magazine
Marine Construction Magazine Logo

We cover topics of usefulness to the Marine Construction or related Industry from projects, pile driving, dock building, bridges and safety, you've found a good publication.

We are a digital publication, that goes out to over 30,000 hand-picked industry leaders and subscribers. Welcome Aboard!

Follow us

© Copyright 2022 - 2024, MarineConstruction®Magazine. All Rights Reserved
Privacy Policy | Cookie Policy | Privacy Settings | Terms of Service