The Magazine of the
Marine Construction Industry

ShibataFenderTeam cylindrical buoys delivered to Mildred Lake in Canada

Reading Time: < 1 Minutes

1407 Views

ShibataFenderTeam has successfully delivered 158 cylindrical buoys to the Syncrude Tailings Dam, located at the northern end of Mildred Lake in Alberta, Canada. The buoys have a diameter of 1,500 nm and different lengths between 750 and 1,750 mm. 

Due to the low temperatures in Alberta during winter months, the lake usually freezes over which could cause problems for the operations on the lake. Therefore, de-icing bubblers were installed in the lake and these bubblers are supported by SFT buoys keeping the bubbler afloat at a certain water depth.

 Measured by the volume of the construction material, Syncrude Tailings dam is the largest embankment/ artificial dam in the world. The lake is constructed and maintained as part of ongoing operations in extracting oil from the Athabasca oil sands. 

SFT buoys were chosen for this project because they are unsinkable, have low maintenance and withstand the tough marine applications and environments

Current Issue

Current Issue of Marine Construction Magazine

Advertisement

Additional Stories

Case Study: Bridge over Canisteo River – Steuben County, New York

Case Study: Bridge over Canisteo River – Steuben County, New York

Samuel Roll Form Group BACKGROUND As part of the Build Now New

Consolidated Chassis Rolls Out 12,000th Chassis

Consolidated Chassis Rolls Out 12,000th Chassis

Consolidated Chassis Management (CCM), a national chassis pool company, announced the successful

AWO Honors Crowley Mariners for Heroic Rescues

AWO Honors Crowley Mariners for Heroic Rescues

The American Waterways Operators (AWO) has awarded Crowley mariners serving on the

CRANES AND MARINE CONSTRUCTION – “EMPLOYER RESPONSIBILITIES”

CRANES AND MARINE CONSTRUCTION – “EMPLOYER RESPONSIBILITIES”

Employers who operate cranes on a Marine Construction site are responsible for