The Magazine of the
Marine Construction Industry

Bristol, Rhode Island Harbor Rebuilds

Reading Time: 2 Minutes

700 Views

 Steeped in maritime history, Bristol, Rhode Island on Narragansett Bay is a popular New England boating destination. Culminating a five-year planning process, the town recently completed a largescale expansion of its harbor with an SF Marina floating concrete breakwater and dock system as the project’s centerpiece.  

After removing Bristol Harbor’s aging fixed-wave fence, Newport, Rhode Island-based Reagan Marine Construction installed twelve SF Marina SF500 Series floating breakwater pontoons. Engineered to withstand hurricane-force wind and wave action, they have a coupling system that absorbs and distributes the stress loads to the concrete structure and anchoring system. Virtually unsinkable, the 17-foot “W” sections have a unique geometry and heavy mass that makes them exceptionally stable.  

“The breakwater works great,” said Gregg Marsili, Bristol harbormaster. “Not only does it protect the marina, but also the shoreline, our other marina at Rockwell Park, the fuel pier on State Street and the Prudence Island ferry dock.”  

The SF Marina pontoons are anchored with 48 Seaflex® 16-strand mooring hawsers. Designed to mitigate serious storm-caused wave action, they can withstand a drag force greater than 1.12 tons within 80-percent elongation, retracting back to their normal length when tension is eased.  

The environmentally-friendly anchoring solution provides significant stability to the structure by progressively dampening forces, even during the most severe of storm conditions.  

On the gangplank, in center, left to right: Peter Alviti, Jr., director Rhode Island Department of Trasnportation; Gregg Marsili, harbormaster; and Steven Contente, Bristol town administrator.

The 786-foot structure includes an interior dock array for a total of 34 tapered fingers. Bristol Harbor has 22 transient slips for boats up to 40 feet in length, and an additional 500 feet of dock space with a 12-foot draft that can accommodate vessels up to 200 feet long. The marina provides electrical and potable water service and public wi-fi. For more information on the breakwater and dock system, visit www.sfmarinausa.com.

Current Issue

Current Issue of Marine Construction Magazine

Advertisement

Additional Stories

Caterpillar to Amplify Electrification and Energy Solutions at CES 2024

Caterpillar to Amplify Electrification and Energy Solutions at CES 2024

Caterpillar Inc. was set to demonstrate the Power of Possible at CES

Meever USA announces its “Meever Beaver” marketing character

Meever USA announces its “Meever Beaver” marketing character

Meever USA is proud to announce the newest addition to the Meever

NTSB Accident Brief: Collision between Yacht Utopia IV and Tank Vessel Tropic Breeze

On December 23, 2021, about 2201 local time, the motor yacht Utopia

Commercial Diving is Out of Sight

Commercial Diving is Out of Sight

Marine construction relies on the skill and experience of divers who perform