The Magazine of the
Marine Construction Industry

Golden Marine Systems Advances Restoration at Salty Sam’s Marina

Appeared in Marine Construction Magazine Issue V, 2024

Reading Time: < 1 Minutes

Golden Marine Systems, in conjunction with Gorman Marine Construction, is restoring Salty Sam’s Marina in Fort Myers Beach, following the devastation caused by Hurricane Ian in September 2022. The hurricane’s destructive force left the marina in ruins, but Golden Marine Systems has been instrumental in bringing the marina back to life.

Recently, Golden Marine Systems completed the installation of the new D-Dock, featuring their 850 Series dock system. The dock is equipped with Endeck Ashwood decking, known for its durability and low maintenance. The system also includes 12-inch adjustable cleats, pile guides and finger piers, all designed to provide a robust and versatile docking solution. The system is built to withstand harsh marine conditions while providing a safe and user-friendly environment for boaters.

With D-Dock now installed, work on C-Dock is underway. The ongoing efforts at Salty Sam’s Marina represent another step in the broader restoration of the marina and the Fort Myers Beach area. The project is part of a larger initiative to rebuild and enhance the region’s waterfront infrastructure, making it more resilient against future storms.

Golden Marine Systems’ involvement in the restoration underscores their commitment to supporting communities affected by natural disasters. Their work at Salty Sam’s Marina is not only about rebuilding but also about strengthening the local boating community and fostering a sense of renewal and hope in the wake of Hurricane Ian. Mike Shanley, president of Golden Marine Systems, stated that Golden is very proud to have been chosen to replace the marina and looks forward to the completion of the project, and while the marina restaurant and activities remain open during construction, the resumption of public boating activities at this landmark marina.  For more information about Golden Marine Systems, visit www.goldenmarinesystems.com.

Current Issue

Current Issue of Marine Construction Magazine

Advertisement

Additional Stories

American Bridge rebuilds Pinellas Bayway bridge with composite fenders

American Bridge rebuilds Pinellas Bayway bridge with composite fenders

The Florida Department of Transportation (FDOT) awarded a design-build contract to American

Wide Flange Beams – Integral Parts of Cofferdams and Bracing Systems

Wide Flange Beams – Integral Parts of Cofferdams and Bracing Systems

Nucor Skyline is a North American leader in supplying wide flange to

Alternative Power Trends at The Utility Expo

Alternative Power Trends at The Utility Expo

By the Utility Expo staff With intense global initiatives to reduce carbon

Let’s Talk Safety:  Free-falling drop hammer crushes employee  

Let’s Talk Safety:  Free-falling drop hammer crushes employee  

Employee #1 and his employer were building a wooden pier, supported by