The Magazine of the
Marine Construction Industry

HAND TOOL SAFETY

Reading Time: < 1 Minutes

2891 Views

Hand tool safety is incredibly important. Here are some policies you should consider implementing:

  • Employers should not issue or permit the use of unsafe hand tools, including tools that may be furnished by employees or employers.
  • All hand tools must be appropriately maintained.   
  • Proper training must be given to all employees to ensure users know the hazards of each piece of equipment 
  • Tools should only be used for their designed purpose.
  • Inspect tools and equipment to make sure that they are in proper working order. 
  • Tools must be kept clean and checked for defects.

Employees should be encouraged to: 

  • Ask how to use a piece of equipment or a tool if you are unfamiliar with it. 
  • Never force the tool if it is stuck. 
  • Use extra caution when using a sharp tool. 
  • Ensure always be sure that proper guards are in place.
  • Always wear shatter-resistant eye protection with side shields when working with a tool or equipment which can make materials airborne.
  • Be sure all electrical tools are grounded before using them. Use double insulated (internal ground) cords or ground-fault circuit interrupters (GFCI, especially if any moisture or water is near.
  • Always turn off a machine when there’s a problem, adjustment, cleaning, or repair required. Utilize the lock/out tag/out program to prevent accidental turn-on of equipment.
  • Be sure to shut off gasoline-powered equipment before refueling.

Finally, only trained employees should be allowed to operate powder-actuated tools.  All powder-actuated tools shall be tested daily before use, and all defects discovered before or during use need to be corrected.  

Current Issue

Current Issue of Marine Construction Magazine

Advertisement

Additional Stories

The Marine Construction Industry – Managing The Risks

The Marine Construction Industry – Managing The Risks

The marine construction industry is booming in the US. Ports are expanding

McCarthy Completes Largest Public Port Project on Texas Coast, Port Freeport Berth 8

McCarthy Completes Largest Public Port Project on Texas Coast, Port Freeport Berth 8

McCarthy Building Companies, Inc. has completed construction of Berth 8 at Port

The Uig Ferry Terminal, on the Isle of Skye, equipped with ShibataFenderTeam Solutions

The Uig Ferry Terminal, on the Isle of Skye, equipped with ShibataFenderTeam Solutions

The Uig Ferry Terminal, a key gateway for Scotland’s Western Isles ferry

348 Series 2 Builds Parking Garage in Wilmington, N.C.

348 Series 2 Builds Parking Garage in Wilmington, N.C.

In June 2018, North Carolina Governor Roy Cooper signed House Bill 1054