The Uig Ferry Terminal, on the Isle of Skye, equipped with ShibataFenderTeam Solutions

Appeared in Marine Construction Magazine Issue V, 2024

Reading Time: 2 Minutes

The new dock at the Uig Ferry Terminal. Photo: John McCleod, RJ McLeod.

The Uig Ferry Terminal, a key gateway for Scotland’s Western Isles ferry services, is undergoing a major modernization. The improvements include strengthening the berthing structure, expanding the marshaling area, replacing the linkspan, repairing and widening the approach road, adding a new waiting shelter, and conducting dredging and utilities works. Once complete, the port will become a more efficient and resilient travel hub, benefiting both the region’s economy and the local community.

Contractor RJ McLeod phased the project to reduce local disruption. In close collaboration, we designed and delivered a customized solution comprising seven sets of Double Cone Fender Systems, each with two Cone Fenders (SPC 1100, G2.3) and a large closed box panel (9,080-by-3,000 mm), eight sets of Element Fenders Systems (FE 1,000-by-1,000 G2.8) and seven sets of Element Fender Systems (FE 100 x L1150, G2.9) completed with custom manufactured pile jackets and steel panels in different sizes. The project scope also included 18 Horn Bollards with various load capacities.

The area’s tidal range, which varies from 4.2 meters to 1.6 meters during neap tides, significantly influenced the fender system design. Our in-house engineering team customized 9-meter-high panels to ensure consistent energy absorption and optimal performance, regardless of sea level fluctuations. Shear chains were also incorporated to provide stability and reliable side berthing at the pierhead.

Additionally, due to the challenging conditions on the Isle of Skye, our engineering experts tailored the design to streamline the fender installation process. Pile jackets allow all fender components to be prefabricated onto a tubular pile, which can then be easily positioned over the driven pile in the seabed, eliminating the need for welding after pile driving.

The modernization of the Uig Ferry Terminal will provide a safer and enhanced experience for all ferry and harbor users. This project is yet another example of ShibataFenderTeam’s signature holistic approach, which we have long advocated and is now officially endorsed by the PIANC MarCom WG211 report Guidelines for the Design, Manufacturing, and Testing of Fender Systems 2024.

Aerial of the port of Uig, Island of Skye, Scotland.

Current Issue

Current Issue of Marine Construction Magazine

Advertisement

Additional Stories

VALUING DOCKS, PIERS, AND MARINAS

VALUING DOCKS, PIERS, AND MARINAS

THE LEADING MARINE INSURANCE INDUSTRY TRADE ASSOCIATION OFFERS GUIDELINES ON VALUING MARINE

SUGGESTED MARINA WALKWAY & HANDRAIL REQUIREMENTS

SUGGESTED MARINA WALKWAY & HANDRAIL REQUIREMENTS

As with any Floating or Fixed, Dock or Marina Structure, one cannot

Collision between Offshore Supply Vessel Cheramie Bo Truc No 22 and Articulated Tug and Barge Mariya Moran/Texas

Collision between Offshore Supply Vessel Cheramie Bo Truc No 22 and Articulated Tug and Barge Mariya Moran/Texas

NTSB Accident Brief On November 14, 2019, about 0415 local time, the

CHAIN SAW SAFETY

CHAIN SAW SAFETY

Dock building by a Marine Contractor is commonplace. With this comes the