Employee #1 and a trackhoe operator were installing sheet pilings in a ninefoot- deep hole that was dug for a manhole in a sewer line. The pilings were to protect the employees from cave-ins. 

Initially, the operator would hold up each piling with the trackhoe bucket, while Employee #1 put it into place. The trackhoe then would be used to push the piling into the mud. 

As the operator maneuvered the trackhoe to get it into position, the bucket came into contact with a high power line that contained 7,620 volts. Employee #1 came into contact with the sheet piling and was electrocuted.  

What went wrong?  

No information given to determine fault, but installing steel piling near a high-voltage power line—close enough for a trackhoe come into contact with both the power line and the piling—is inherently dangerous..

Current Issue

Current Issue of Marine Construction Magazine

Advertisement

Additional Stories

McCarthy Beat Hurricane Deadline to Install Pile at Freeport Harbor Channel  

McCarthy Beat Hurricane Deadline to Install Pile at Freeport Harbor Channel  

The start of hurricane season was a firm deadline for a complex

Bailey Electronics Breaks Ground on Canadian Facility

Bailey Electronics Breaks Ground on Canadian Facility

Bailey International’s electronics division, formerly known as Sure Grip Controls, a provider

ShibataFenderTeam supplied cone fenders for bulk terminal in Puerto Cortés, Honduras

ShibataFenderTeam supplied cone fenders for bulk terminal in Puerto Cortés, Honduras

Puerto Cortés is the largest seaport in Honduras and one of the

Preparing Your Marina for Hurricane Season

Preparing Your Marina for Hurricane Season

Golden Marine Systems is a designer and builder of docks and marinas,