Marine Construction® Magazine

  • Home
  • RESOURCES
    • EQUIPMENT
    • MATERIALS
    • MANUALS
    • SERVICES
    • LEGAL
    • EDUCATION
    • SAFETY
  • SUBSCRIPTION
    • PREVIOUS ISSUES
  • ADVERTISING
  • WEBINAR
  • VIDEOS
  • CONTACT
  • BLOG
  • Classifieds
  • Jobs
MCMag NEWS
  • Contact of Bulk Carrier Atlantic Huron with the Soo Locks West Center Pier   |   May 31 2023

  • Link-Belt to showcase new era of truck crane   |   May 26 2023

  • The Costliest Risk That Marine Construction Projects Face—and How to Mitigate It   |   May 24 2023

  • FPT Industrial and IVECO are the definition of “global”   |   May 22 2023

  • The Unstoppable Rise of the Yanmar Compact Track Loader   |   May 22 2023

  • Germany’s ShibataFenderTeam supplies fenders for the expansion of the Port of Freeport, Texas   |   May 22 2023

 
You are at :Home»BLOG»FLOATING DOCK ANCHORAGE

FLOATING DOCK ANCHORAGE

Mar 30 2021 BLOG Comments Off on FLOATING DOCK ANCHORAGE 5615 Views

If asked about anchoring, chances are good that a marina engineer will think about docks before boats. Securing and stabilizing floating docks can be extremely challenging. It becomes even more challenging if the facility experiences significant seasonal or tidal water level fluctuations or those levels change quickly during storm or flood events.

A floating dock’s adaptability or responsiveness to changing water levels requires the support of a mooring system that can accommodate those changes. That system must also be cost-effective, align with the marina’s operational capacity, and respond to the climatic factors at work along lakes, rivers and oceans. Developing and adopting a site-responsive anchoring strategy is essential for navigating the ups and downs caused by dynamic shifts in water depth.

Water-Level Dynamics

The first step is to understand what a location’s relative water depths and water-level fluctuations will require from that system. Analyzing the marina’s extremes, both high and low, and how quickly those levels can change is foundational to selecting the right solution.

Marinas located on reservoirs often experience significant seasonal changes. In addition to these routine annual rhythms, intense or prolonged rainfall events can drive water-level fluctuations in excess of 60 feet. Marinas facing an increase in tidal fluctuations, or flashy conditions due to upland runoff or storm surge, must be designed for a very different set of challenges. The fact that these conditions are projected to become more frequent or extreme due to climate shifts adds another layer of complexity that must be considered.

Even inland lakes are starting to see a more dynamic range of water level fluctuations, frequently due to upland development within the watershed or variability in ice cover. Both hindcasting and forecasting are needed to evaluate the range of influences key to selecting the most suitable mooring system.

These diagrams compare elastic mooring with a chain and anchor system for Chatfield Marina. Note the need for clump weights to maintain performance of the chain-and-anchor system. 

Operational Needs and Capacity

Like every built system, mooring systems have costs related to their installation, management, maintenance and ultimately repair and replacement.

Knowing a marina operator’s capacity to respond to dynamic conditions is just as important as knowing the conditions that the system must respond to. A higher maintenance system could be the right choice for some marinas and become an ongoing headache for operators and patrons in others. For example, cable and winch systems can require a high degree of labor to adjust in response to frequent water level variations.

Anchoring must also accommodate a dynamic range of day-to-day operational requirements. Marinas with floating buildings or floating infrastructure in addition to docks may need to consider a combination of strategies based on differential loading, freeboard expectations or stability preferences. Marinas that host deeper draft boats need to anticipate how the selected system could potentially interfere with navigation. One simple approach could be hiding lines under headwalk or finger piers.

There are four relatively common options for anchoring floating docks. While they can be applied independently, or less frequently in combination with each other to create a hybrid system, each one has its own advantages and limitations with respect to addressing water-level fluctuations.

Pile Restraint

A pile-restrained floating dock system is considered to offer the greatest amount of control over lateral movement and is similar to the level of stability offered by a fixed-dock system. Coastal dock systems are often pile-restrained due to the extreme conditions they face, dock type preference and boater expectations. While piles can be used with a variety of floating dock systems, they are a particularly good match for concrete pontoons – which benefit from the added stability piles provide.

The main limitations to pile-restrained systems are water heights and environmental considerations. For marinas that experience significant changes in water levels over the course of the year or are mandated to meet extremely improbable conditions as part of permit conditions, the required piles may be too tall to be practical or aesthetically appealing. Imagine piles standing 60 or 80 feet above average water pool levels like a sequoia forest without any greenery.

Pile installation is also seen by a number of agencies as having a significant environmental impact on a variety of aquatic species throughout a range of different seasons. Soil conditions influence pile-driving ability and embedment. Ice jacking – a process that involves ice sheets gripping onto piles and pulling them out of the ground – also plays into the decision about the suitability of piles in cold weather climates.

Chain and Anchor

This system has been around a long time and represents a cost-effective, durable option. While anchor blocks of concrete or homemade anchors made from filled drums work, this system also works well with helical anchors, which screw in rather than rest on or near the surface of the seabed. Geotechnical considerations, in addition to the weight of docks and vessels being moored, are significant considerations when evaluating which type of anchor to use with chain.

One of the keys to its effectiveness is the length and scope (angle between the seabed and hypotenuse connection to the dock) of the chain. A chain-and-anchor system relies on the suspended weight of the chain and the resistance of its anchor for stability and to minimize the lateral dock movement. This makes relative water depth an important performance consideration. When used in shallower water, there is less chain weight, which leads to less stability in the system. It also becomes more problematic to use, the greater the difference gets between high and low water levels.

Cable and Winch

A cable-and-winch system provides flexibility to address a wider range of water level fluctuations. As water depths rise and fall, the length and tension of the lines can be manually adjusted with a winch.

Taking advantage of this flexibility can require considerably more effort from a management standpoint, so it’s important to have the staffing resources required to adjust and maintain the system. In situations where water levels can change rapidly, there will also be a need for rapid manual adjustment of the system. As force on some types of cables increase, there can be a tendency for the line to want to twist. This can be problematic with helical style anchors if appropriate swivels aren’t added, resulting in movements that ultimately can lead to the anchor twisting out like a screwdriver. This problem can be addressed by installing proper attachment hardware between the cable and anchor or by substituting an ultra-high-molecular-weight polyethylene braided rope.

Over-tensioning of lines or high water can place excess force on anchors, resulting in sliding or anchor movement, making it important that the pull angle be relatively shallow. Oftentimes, this results in anchors being placed a great distance from the dock that is being restrained. To minimize the tension on lines, pull on docks, and level of management time and effort, operators may leave extra slack in the cable lines. This means the docks tend to move around more, making live loads much more live. This looser anchoring can also make it feel awkward to walk on the docks. And while a flexible dock system can accommodate this movement if the entire system allows for it, it isn’t the best option for more rigid dock systems like concrete pontoons.

Elastic Mooring

This passive system uses stretchy cables that adapt automatically to water level fluctuations. The number and size of elastic cables depend on the loads of what’s being anchored. Much like a rubber band, elastic systems stretch to adjust to water level changes. Most systems maintain a fairly uniform downward pull or tension on the docks, making the docks uniformly stable almost regardless of water level. The cable’s combination of strength and stretch enhances its performance during storms, when its ability to absorb sudden, violent force makes it less likely to fail. In extreme conditions and before the elastic system breaks due to excessive stretching, a bypass system automatically engages and a solid cable kicks in. Anecdotal evidence from discussions with marina operators and some system manufacturers suggests these elastic systems are ideal, exhibiting little failure even in extreme conditions resulting from hurricane forces.

2021-03-30
MCMag
Twitter Facebook linkedin Pinterest Email Print More

Authors

Posted by : MCMag
Previous Article :

THE IMPORTANCE OF “SLINGS” WHEN WORKING OVER WATER

Next Article :

Lee Composites, Inc. Your One-Stop Marine Infrastructure Shop

Related Articles

Contact of Bulk Carrier Atlantic Huron with the Soo Locks West Center Pier

Contact of Bulk Carrier Atlantic Huron with the Soo Locks West Center Pier

MCMag May 31 2023
Why are Composites Ideal for Docks and Marinas?

Why are Composites Ideal for Docks and Marinas?

MCMag Nov 18 2020
What To Do If A Boat Lift “Drifts”

What To Do If A Boat Lift “Drifts”

MCMag May 16 2020

Advertisement

AD: Major 2 day auction Marine & Bridge Construction Equipment Sammy P Auction Service June 23 & 24 Mercer PA

Current Issue

Current Issue of Marine Construction Magazine Volume I 2023

Previous Issue

Previous Issue of Marine Construction Magazine Volume I 2023
Marine Construction Magazine Logo Marine Construction® Magazine publishes Six (6) Issues per year, once every 2-Months. We are by no means your typical publication. With over 30,000 readers, we pride ourselves on covering the topics of “actual usefulness” to our readers. Yes, we are a little unorthodox but…we like it like that. The bottom line is, if you are in the Marine Construction or related industry…you’ve come to the right place.

Random Posts

  • BARGE SAFETY AND INSPECTION

    BARGE SAFETY AND INSPECTION

    MCMag Jun 05 2020
  • The MCM Conversation with Fitz O’Donnell, Vice President and Business Unit Leader, McCarthy Building Companies, Houston, Texas

    The MCM Conversation with Fitz O’Donnell, Vice President and Business Unit Leader, McCarthy Building Companies, Houston, Texas

    MCMag Jan 26 2022
  • Green Bay Decking Rebrands as DuxxBak Composite Decking

    Green Bay Decking Rebrands as DuxxBak Composite Decking

    MCMag Nov 16 2022

Follow us

Sign up for our eNewsletter

eNewsletter Signup Form
© Copyright 2022, MarineConstruction®Magazine. All Rights Reserved