Marine Construction® Magazine

  • Home
  • RESOURCES
    • EQUIPMENT
    • MATERIALS
    • MANUALS
    • SERVICES
    • LEGAL
    • EDUCATION
    • SAFETY
  • SUBSCRIPTION
    • PREVIOUS ISSUES
  • ADVERTISING
  • WEBINAR
  • VIDEOS
  • CONTACT
  • BLOG
  • Classifieds
  • Jobs
MCMag NEWS
  • Crane Cracks and Fatigue   |   Sep 25 2023

  • The Marine Construction Magazine Conversation with … Women in Engineering    |   Sep 22 2023

  • Alternative Power Trends at The Utility Expo   |   Sep 20 2023

  • Harnessing the ShibataFenderTeam fender system’s safety potential to support offshore wind power supply   |   Sep 20 2023

  • Crowley, BWXT Debut Nuclear Power Generation Vessel Concept   |   Sep 20 2023

  • Funded Alternative Energy Projects Announced – U.S. Department of Energy Map   |   Sep 20 2023

 
You are at :Home»NEWS»Composite Pile Sleeves for a Utility Crossing in Key West, Fla.

Composite Pile Sleeves for a Utility Crossing in Key West, Fla.

Jul 19 2023 NEWS Comments Off on Composite Pile Sleeves for a Utility Crossing in Key West, Fla. 651 Views

A barge struck a utility crossing in the Florida Keys in late 2020. The crossing—from Key West to Fleming Key—was located within U.S. Navy property. The aerial crossing supported all the waste water for Key West and was at risk of collapsing after both piles on the struck bent were broken through.

The contractor, Ebsary Foundation of Miami, Fla., mobilized to install emergency temporary support to take the weight off of the compromised support. Then the permanent cased augercast pile repair was initiated. Three new dolphin clusters were also installed to prevent damage to vital infrastructure in the future.

The city of Key West selected the Lee Composites LC120 HDPE Pile Sleeves Gray/Black 35-foot length to fit 14-inc OD steel piles. The goals were to provide corrosion protection to the steel pile; to protect the pile from abrasion; and to allow the pile sleeves to blend in with the concrete bridge piling.

Given the project conditions—which included constant boat traffic, strong currents and coordination of a city emergency project on Navy property—a fast and reliable solution was made to use the LC120 HDPE Pile Sleeves.

The LC120 & LC187 HDPE Pile Sleeves provide the following benefits:

  • American-made, prefabricated in Houston, Texas
  • available in black & light gray colors;
  • short lead time: approximately 2-3 weeks;
  • will fit most any consistent size OD pile (steel, fiberglass, concrete);
  • multiple lengths available;
  • made from virgin high-density polyethylene;
  • ready to slide down the pile for final assembly (hardware not included);
  • can be turned to get better surface area over time or flipped from bottom to top.
2023-07-19
MCMag
Twitter Facebook linkedin Pinterest Email Print More

Authors

Posted by : MCMag
Previous Article :

Bridge Replacement Underway in Elizabethtown, N.C.

Next Article :

Sling Safety in Marine Construction

Related Articles

U.S. Prefabricated Pile Sleeves, Round or Square, to Fit Any Size Pile

U.S. Prefabricated Pile Sleeves, Round or Square, to Fit Any Size Pile

MCMag Mar 22 2021
Germany’s ShibataFenderTeam supplies fenders for the expansion of the Port of Freeport, Texas

Germany’s ShibataFenderTeam supplies fenders for the expansion of the Port of Freeport, Texas

MCMag May 22 2023
Green Bay Decking Announces New Marina Product Division

Green Bay Decking Announces New Marina Product Division

MCMag Apr 11 2022

Advertisement

Current Issue

Current Issue of Marine Construction Magazine Volume IV 2023

Previous Issue

Previous Issue of Marine Construction Magazine Volume III 2023
Marine Construction Magazine Logo Marine Construction® Magazine publishes Six (6) Issues per year, once every 2-Months. We are by no means your typical publication. With over 30,000 readers, we pride ourselves on covering the topics of “actual usefulness” to our readers. Yes, we are a little unorthodox but…we like it like that. The bottom line is, if you are in the Marine Construction or related industry…you’ve come to the right place.

Random Posts

  • Preventing Trench Collapse

    Preventing Trench Collapse

    MCMag Mar 29 2020
  • NUCOR COLMAN DOCK – SEATTLE, WASHINGTON

    NUCOR COLMAN DOCK – SEATTLE, WASHINGTON

    MCMag Jan 12 2021
  • Trimble Construction One Construction Management Platform Bridges Industry Gap Between Constructible Models and Project Financials   

    Trimble Construction One Construction Management Platform Bridges Industry Gap Between Constructible Models and Project Financials   

    MCMag May 19 2023

Follow us

Sign up for our eNewsletter

eNewsletter Signup Form
© Copyright 2022, MarineConstruction®Magazine. All Rights Reserved