Marine Construction® Magazine

  • Home
  • RESOURCES
    • EQUIPMENT
    • MATERIALS
    • MANUALS
    • SERVICES
    • LEGAL
    • EDUCATION
    • SAFETY
  • SUBSCRIPTION
    • PREVIOUS ISSUES
  • SOFTWARE
  • ADVERTISING
  • WEBINAR
  • VIDEOS
  • CONTACT
  • BLOG
  • Classifieds
  • Jobs
MCMag NEWS
  • Prevent Collapsing Structures with Migratory Corrosion Inhibitor Technology   |   Jun 05 2022

  • SFT installed cone fenders to accommodate largest shortsea RoRo ships   |   Jun 05 2022

  • The MCM Conversation with: Isaiah Pitz   |   Jun 05 2022

  • Safety Begins with Simple Steps   |   May 31 2022

  • Crane Safety Checklist   |   May 23 2022

  • Listen for Danger   |   May 23 2022

 
You are at :Home»NEWS»U.S. Prefabricated Pile Sleeves, Round or Square, to Fit Any Size Pile

U.S. Prefabricated Pile Sleeves, Round or Square, to Fit Any Size Pile

MCMag Mar 22 2021 NEWS Comments Off on U.S. Prefabricated Pile Sleeves, Round or Square, to Fit Any Size Pile 3373 Views

You can call Lee Composites, Inc. LC120 & LC187 HDPE Pile Sleeve is prefabricated at our Houston, TX factory, available in black or light grey for any size round or square “steel, fiberglass, concrete, pvc” piling and any length. 

We are the only firm in the industry that supplies a prefabricated HDPE Pile Sleeve that has a tolerance of approx. +1/16” to the OD of the piling. As a result, it is virtually ready to slide down the pile for final installation. Our products are available in multiple lengths, are made from virgin, high density polyethylene. They can be turned to get better surface area over time or flipped from bottom to top.

Benefits:

  • Better aesthetics
  • Abrasion resistant
  • Corrosion resistant
  • Ease of installation
  • Low maintenance
  • Long service life

Now Available – The LC120 & LC187 HDPE Pile Sleeves “Fuse Welded” to the PE Top Caps, (Flat or Cone Type) at our factory. The eliminates attachment steel hardware, which will rust over time, thus caps will fall off. Shipped for fast and easy installation.

Lead Time @ 2-4 weeks. 

Call Bob Lee at 281-782-2477 or email boblee@leecomposites.com

2021-03-22
MCMag
Twitter Facebook linkedin Pinterest Email Print More

Authors

Posted by : MCMag
Previous Article :

Sacramento Tower Bridge Fender System Replaced with 238 HSL

Next Article :

How to (Re)Build Your Marina on a Budget

Related Articles

Repair of Steel Structures

Repair of Steel Structures

MCMag Dec 02 2021
Driving Piling Over Water and Lifting Equipment

Driving Piling Over Water and Lifting Equipment

MCMag Feb 02 2021
Falling Overboard

Falling Overboard

MCMag May 23 2022

Advertisement

Current Issue

Current Issue of Marine Construction Magazine Volume III 2022

Previous Issue

Marine Construction Magazine Vol II 2022

More Info!

Marine Construction Magazine Logo Marine Construction® Magazine publishes Six (6) Issues per year, once every 2-Months. We are by no means your typical publication. With over 30,000 readers, we pride ourselves on covering the topics of “actual usefulness” to our readers. Yes, we are a little unorthodox but…we like it like that. The bottom line is, if you are in the Marine Construction or related industry…you’ve come to the right place.

Random Posts

  • Quiet Pile Driving Technology

    Quiet Pile Driving Technology

    MCMag Mar 20 2020
  • Boat Hoists and Lifts

    Boat Hoists and Lifts

    MCMag May 14 2020
  • SEAWALLS & BULKHEADS

    SEAWALLS & BULKHEADS

    MCMag Aug 02 2019

Follow us

Sign up for our eNewsletter

© Copyright 2019, MarineConstruction®Magazine. All Rights Reserved