Marine Construction® Magazine

  • Home
  • RESOURCES
    • EQUIPMENT
    • MATERIALS
    • MANUALS
    • SERVICES
    • LEGAL
    • EDUCATION
    • SAFETY
  • SUBSCRIPTION
    • PREVIOUS ISSUES
  • SOFTWARE
  • ADVERTISING
  • WEBINAR
  • VIDEOS
  • CONTACT
  • BLOG
  • Classifieds
  • Jobs
MCMag NEWS
  • Link-Belt HTC-86100 Builds Cruise Terminal at Port Canaveral, Fla.   |   Jul 25 2022

  • Aarsleff’s Centrum Pile System does double duty on Dutch photovoltaic project   |   Jul 24 2022

  • Port of Los Angeles Enters Agreement with IBM to Create Cyber Resilience Center      |   Jul 17 2022

  • Greek temple ruins suggest cranes were in use as early as 700 B.C.   |   Jul 15 2022

  • Smith Brothers builds in Chesapeake Bay for more than 100 years   |   Jul 15 2022

  • Buried Wharves Uncovered on Manhattan Waterfront   |   Jul 15 2022

 
You are at :Home»NEWS»ShibataFenderTeam supplies fenders to refurbished Port of Manzanillo, Mexico

ShibataFenderTeam supplies fenders to refurbished Port of Manzanillo, Mexico

Ed Hall Jul 12 2022 NEWS Comments Off on ShibataFenderTeam supplies fenders to refurbished Port of Manzanillo, Mexico 59 Views

The port area of Manzanillo has a size of around 440 hectares (1,087 acres) with 19 berths that accommodate commercial vessels and cruise ships. Due to a refurbishment of the inland port of San Pedrito, the Port Authority in Manzanillo decided to replace the existing fender systems at all operating berths. The new fender systems had to match the existing fenders in terms of performance and berthing line to ensure a smooth operation, but due to the large variety of berth structures, the fenders had to be customized for each berth.

 ShibataFenderTeam’s sales engineers designed a suitable and customized solution and were awarded the order at the beginning of the year. With our Spanish native speakers and experienced colleagues, we combined local contact with international expertise. SFT delivered 66 sets of SPC 1000 Cone Fender Systems (including steel panels of 3,020 by 2,120 mm) for the San Pedrito Terminal. Additionally, the order included 95 Double Bitt Bollards (capacity 150 tonnes) and around 2,000 pieces of UHMW-PE replacement pads in various sizes. It took only six months from placing the order until the installation was finished in June 2020.

 ShibataFenderTeam is proud to have been chosen by API Manzanillo for this fender replacement for one of the main container terminals on the Mexican Pacific Coast, and we wish all shipping lines successful operations at San Pedrito Terminal.

Republished from Marine Construction Magazine Issue I, 2021

2022-07-12
Ed Hall
Twitter Facebook linkedin Pinterest Email Print More

Authors

Posted by : Ed Hall
Previous Article :

American Bridge rebuilds Pinellas Bayway bridge with composite fenders

Next Article :

OZ Lifting Launches Stainless Steel Trolley

Related Articles

Crane Safety Checklist

Crane Safety Checklist

MCMag May 23 2022
Driving Piling Over Water and Lifting Equipment

Driving Piling Over Water and Lifting Equipment

MCMag Feb 02 2021
JMS Design Another Floating Dry Dock

JMS Design Another Floating Dry Dock

MCMag May 19 2021

Advertisement

Current Issue

Current Issue of Marine Construction Magazine Volume III 2022

Previous Issue

Marine Construction Magazine Vol II 2022

More Info!

Marine Construction Magazine Logo Marine Construction® Magazine publishes Six (6) Issues per year, once every 2-Months. We are by no means your typical publication. With over 30,000 readers, we pride ourselves on covering the topics of “actual usefulness” to our readers. Yes, we are a little unorthodox but…we like it like that. The bottom line is, if you are in the Marine Construction or related industry…you’ve come to the right place.

Random Posts

  • Going to Extremes: Construction in the Polar Regions

    Going to Extremes: Construction in the Polar Regions

    MCMag Mar 21 2022
  • Falling Overboard

    Falling Overboard

    MCMag May 23 2022
  • CHAIN SAW SAFETY

    CHAIN SAW SAFETY

    MCMag Oct 01 2019

Follow us

Sign up for our eNewsletter

© Copyright 2022, MarineConstruction®Magazine. All Rights Reserved