The Magazine of the
Marine Construction Industry

SFT designed and supplied double cone fender systems for PSA container terminal in Sines, Portugal

Reading Time: 2 Minutes

866 Views

Sines beach and marina at sunset with container port cranes behind.

The Portuguese city of Sines is located on the Atlantic coast in the southwest of the country. The Port of Sines is a deep-water port with excellent access to the Atlantic. With an annual capacity of 2,3 million TEU and its advanced terminals, PSA Sines is one of the most important container terminals in Europe and a major hub in Portugal. To facilitate further growth, the container terminal has been expanded to accommodate the increased capacity of larger and additional container ships. SFT had already supplied the fender systems for two previous phases of construction works at the Port of Sines, with a total quay wall length of 1,140 meters and 50 cone fender systems.  

PSA Sines contracted the Portuguese construction company Mota Engil and Etermar for the fourth phase of the berth expansion at Terminal XXI which will extend the quay to a length of 1,750 meters. For this phase, our client requested a change in the design of the panels to increase the service life of the fender systems by a reduced submerged portion of the panels and improved maintenance. Together with our experienced engineering department, we proposed a modified design to meet the customer’s requirements and updated spacing between the fender systems.  

Our Spanish office handled the order for 17 sets of Double SPC 1100 Cone Fender Systems, nine pieces of 850-mm-by-4,200-mm rubber ladders and 16 SFT Staghorn Bollards with a capacity of 200 tons.  

Despite COVID-19 related government restrictions in Malaysia and logistical problems due to limited cargo space for 4,750-mm-by-3,700-mm steel panels that required special flat racks for shipment, we successfully delivered the order in mid-2021.  

Our colleagues Alvaro Rodero and Matheus Torres performed the commissioning together with the contractors and the end user during an inspection of the installed systems. They also checked the fenders of the previous phases, which were still in good condition and worked perfectly.  

We are pleased to have received very good feedback on our service and material quality and wish PSA Sines all the best for the further port development.  

Sines beach and marina at sunset with container port cranes behind.

Current Issue

Current Issue of Marine Construction Magazine

Advertisement

Additional Stories

Chevron Introduces New Rykon Formula to Grease Product Line

Chevron Introduces New Rykon Formula to Grease Product Line

The calcium sulfonate complex-based grease is designed for heavy-duty and extreme pressure

Lubricating a Boat Lift

Lubricating a Boat Lift

For cable lifts, use a marine-grade grease to lubricate bearings and pulleys.

CP&A Encourages Structural, Civil Engineers to Consider Crane Industry

CP&A Encourages Structural, Civil Engineers to Consider Crane Industry

Casper, Phillips & Associates Inc. (CP&A) is reaching out to trainee and

Tele Radio Shows Port Remote Controls at TOC Europe

Tele Radio Shows Port Remote Controls at TOC Europe

Tele Radio showed a variety of radio remote control solutions for port