The Magazine of the
Marine Construction Industry

Northern Exposure—APE Vibratory Hammers in Northwestern Canada

Reading Time: < 1 Minutes

903 Views

APE equipment up to the task in the harsh working conditions of northwestern Canada.

Some years ago, APE did a 5,000-pile job for a 3,000-man camp at Keeyask, where we showcased some of our pre-drilling capabilities. In 2015, it was the converter station at Keewatinohk, where we pre-drilled in seasonal frost, permafrost, and some of the Canadian shield with our latest achievement in drilling technology, the “Polar Penetrator.” 

This patented drag bit allows high-pressure air to eject cuttings out of the hole as soon as they are loose, typically at least two or three times faster than conventional tools. This drilling technique, along with down-hole accessories, allows APE’s HD program to stay in the lead on today’s helical pile market. 

Elsewhere in western Canada, K+S Potash Canada (KSPC) is built a potash handling and storage facility at Port Moody, B.C. Potash products arriving by rail from the Saskatchewan-based mine are stored on-site and transported to vessels destined for K+S Group’s international clients. 

Roughly 700 driven pipe pile, ranging from 24 inches to 36 inches, were driven. Keller Foundations opted to go with the APE D70-52 as their work horse for the majority of these piles. This 7.0-metric ton ram is pound for pound the hardest hitting hammer out there today, and its new octagon design allows for better cooling and larger fuel capacity, making hard driving jobs a little easier.

D70-52 driving pile in Saskatchewan for KSPC

Current Issue

Current Issue of Marine Construction Magazine

Advertisement

Additional Stories

Decks & Docks Acquires The Deck Supply

Decks & Docks Acquires The Deck Supply

Decks & Docks, a distributor of composite decking and outdoor living building

The Handling of Various Pile Types during Marine Construction

The Handling of Various Pile Types during Marine Construction

STORAGE AND HANDLING OF PILES When handling treated timber piles it is

Composites Upgrade Marine Infrastructure

Composites Upgrade Marine Infrastructure

In 2007, the St. Johns River Bar Pilots, who ensure the safe

Trimble acquires B2W Software to Expand its Civil Construction Portfolio

Trimble acquires B2W Software to Expand its Civil Construction Portfolio

Expanded Trimble Construction One Portfolio Enables an End-to-End Digital Experience for Heavy