Duties of a “Pile Inspector”
When the test piles have been driven and the final pile lengths of a project have been authorized, an inspection of the
Driving Piling Over Water and Lifting Equipment
Any and all potential areas in which one plans to lift ANY object or load over water, more specifically ANY “Pile Driving
ESC’S MARINE & FOUNDATION PILING
ESC Group continues to achieve significant milestones as it goes beyond 34 years since its first sheet pile was driven at Magnetic
NUCOR COLMAN DOCK – SEATTLE, WASHINGTON
HISTORY The Washington State Ferry System transports vehicle and passenger traffic throughout the Puget Sound and San Juan Islands. As a part
Composite Fendering Piles Fit The Bill
Wood is a great material for many applications, including marine pilings and fenders — after all, the Italian city of Venice is
Composites Upgrade Marine Infrastructure
In 2007, the St. Johns River Bar Pilots, who ensure the safe navigation of ships in transit between open seawater and the Port
Choosing a Composite or Plastic Decking For Your Dock
Composite materials are another great decking option for docks. Composite decking is usually chosen as a lower maintenance alternative to wood decking.
U.S. Navy FRP Composite Submarine Camels
Kenway Corporation has completed and delivered its first four sets of Universal Composite Submarine Camels (UCSC) to the U.S. Navy. Early this
Marina del Rey Marina has just completed a landmark
Marina del Rey Marina has just completed a landmark, six-year rebuild, consisting of seven phases including the newest technology in dock construction
Composite Decking
Composite materials are another great decking option for docks. Composite decking is usually chosen as a lower maintenance alternative to wood decking.
Why are Composites Ideal for Docks and Marinas?
Editors Note: The following article was originally written by: James Moylan, President and Founder of Design Builders, Inc., Bethesda, MD. Composite Decking
Lee Composites Project in Key West Florida
A barge struck the Utility crossing from Key West onto Fleming Key. The project location was within US Navy property. The aerial
SUGGESTED MARINA WALKWAY & HANDRAIL REQUIREMENTS
As with any Floating or Fixed, Dock or Marina Structure, one cannot stress the important of structurally sound, moreover safe Walkways and
Working Over Water and Lifting Equipment
Any and all potential areas in which one plans to lift ANY object or loadover water should always be properly risk assessed
Minimum Design Criteria for Fixed and Floating Structures
NOTE: Design should meet all Americans with Disabilities Act (ADA)criteria. FIXED STRUCTURESAs a minimum, fixed, covered facilities should be designed to preventdamage
Planning of Lifting Operations
Lifting operations at ANY Port Facility should always be carefully planned, appropriately supervised and carried out to protect the safety of employees