Marine Construction® Magazine

  • Home
  • RESOURCES
    • EQUIPMENT
    • MATERIALS
    • MANUALS
    • SERVICES
    • LEGAL
    • EDUCATION
    • SAFETY
  • SUBSCRIPTION
    • ISSUES
  • SOFTWARE
  • ADVERTISING
  • WEBINAR
    • VIDEOS
  • CONTACT US
  • BLOG
  • Classifieds
MCMag NEWS
  • Duties of a “Pile Inspector”   |   Feb 02 2021

  • Driving Piling Over Water and Lifting Equipment   |   Feb 02 2021

  • ESC’S MARINE & FOUNDATION PILING   |   Jan 13 2021

  • NUCOR COLMAN DOCK – SEATTLE, WASHINGTON   |   Jan 12 2021

  • Composite Fendering Piles Fit The Bill   |   Nov 24 2020

  • Composites Upgrade Marine Infrastructure   |   Nov 24 2020

 
You are at :Home»BLOG»Marina del Rey Marina has just completed a landmark

Marina del Rey Marina has just completed a landmark

MCMag Nov 18 2020 BLOG Leave a comment 3110 Views

Marina del Rey Marina has just completed a landmark, six-year rebuild, consisting of seven phases including the newest technology in dock construction today. This brand new marina is situated adjacent to the recently renovated historic Marina Del Rey Hotel and wraps around the peninsula ultimately flowing directly into the main channel. Located just four miles west of the Los Angeles International Airport sits Marina del Rey Harbor, America’s largest man-made harbor, home to nearly 5,000 boat slips in 22 separate anchorages. The harbor is known for attracting visitors who enjoy a variety of restaurants, retail, biking and walking paths as well as other shore-side attractions and water-based activities such as paddle boarding, kayaking, boating, marine birdwatching and more. 

Though the marina is privately owned and operated, authorization from Los Angeles County, California Coastal Commission, and the Army Corp of Engineer’s was necessary to rebuild the 46-year old marina. The original design included 349 slips, while the renovated marina now totals at 277 slips with thirteen end ties ranging from 35 feet to 65 lineal feet.

The Bellingham Marine docks, used in the marina renovation, feature the latest in floating dock technology and marina amenities utilizing the first-ever US application of Fiberglass Reinforced Polymeric (FRP) Waler and Thru-Rod Technology. The research and development of this product was advanced through common challenges faced when building in an aquatic environment taking into consideration factors such as decomposition and concerns over environmental impacts. FRP Walers provide a product with a virtually unlimited design life, further enhancing the longevity associated with the construction of concrete floating docks.

The innovative and proprietary technology in this particular FRP system brings the advantage of less required periodic maintenance, a lengthened service life when compared to other dock technology, and rust and decay resistance delivered by state of the art corrosion-resistant fiberglass and chemical-free composite system. The composite fiberglass construction is more sustainable than other construction methods, and the entire FRP system has a smaller environmental footprint than comparable traditional systems. The marina also features an advanced pumpout system, modern communication systems, and new utilities providing a functional and aesthetically pleasing result.

In 2018, the Marine Recreation Association’s named Bellingham’s FRP Waler and Thru-Rod technology the recipient of their prestigious Innovation Award. “We could not be happier to have completed the reconstruction of our marina with the newest technology in the marketplace.  Bellingham has been a great partner, to Almar, for over 35 years. During that time Bellingham has built more than 12 projects for us and is in the final design and engineering phase to deliver 2 more marina projects.” says Randy Short, President of Almar Management. Marina Del Rey Marina is truly built for the future of boating, assuring that this historic waterfront destination is accessible to current and future generations of residents and visitors to enjoy.

2020-11-18
MCMag
Twitter Facebook linkedin Pinterest Email Print More

Authors

Posted by : MCMag
Previous Article :

Composite Decking

Next Article :

U.S. Navy FRP Composite Submarine Camels

Related Articles

FIRE PROTECTION

FIRE PROTECTION

MCMag Jul 31 2020
WALKWAYS AND HANDRAILS

WALKWAYS AND HANDRAILS

MCMag Jul 31 2020
DOCKS, PIERS & WHARFS

DOCKS, PIERS & WHARFS

MCMag Aug 02 2019

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *


Deprecated: ctct_get_settings_option is deprecated since version 1.9.0! Use constant_contact_get_option instead. in /home/jennifersmith/public_html/wp-includes/functions.php on line 4859

Advertisement

Current Issue

Current Issue

Previous Issue

Current Issue

More Info!

Marine Construction® Magazine publishes Six (6) Issues per year, once every 2-Months. We are by no means your typical publication. With over 30,000 readers, we pride ourselves on covering the topics of “actual usefulness” to our readers. Yes, we are a little unorthodox but…we like it like that. The bottom line is, if you are in the Marine Construction or related industry…you’ve come to the right place.

Random Posts

  • Minimum Design Criteria for Fixed and Floating Structures

    Minimum Design Criteria for Fixed and Floating Structures

    MCMag Sep 30 2020
  • UNDERWATER REPAIRS & METHODS TO OBTAIN DRY WORK CONDITIONS

    UNDERWATER REPAIRS & METHODS TO OBTAIN DRY WORK CONDITIONS

    MCMag Apr 27 2019
  • Composites Upgrade Marine Infrastructure

    Composites Upgrade Marine Infrastructure

    MCMag Nov 24 2020

Follow us

Sign up for our eNewsletter

Select list(s) to subscribe to


By submitting this form, you are consenting to receive marketing emails from: J.J. Smith & Company, P.O. Box 1915, Naples, FL, 34106, http://www.marineconstructionmagazine.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact
© Copyright 2019, MarineConstruction®Magazine. All Rights Reserved